1999
1999 El Paso-Las Cruces Regional Sustainable Water Project:
Concept Design of ASR Wellfield and Collection Facilities - plus maps. (Final Report)
Construction Details for NEPA Process (Final Technical Memorandum)
Economic Summary for NEPA Process (Final Technical Memorandum)
1999 New-Mexico Texas Water Commission:
BESTSM/MODFLOW Linked Model, Calibration, CDROM.
Users are encouraged to review the report: Hydrologic Modeling Final Report
2000
2000 El Paso-Las Cruces Regional Sustainable Water Project:
Water
Resources Technical Report (Volume 1 of 2), CH2MHILL - El
Paso, TX; 468 pgs., Volume 1 of 2, Water Resources Technical Report
Biological
Resources Technical Report, Volume 1 of 2, CH2MHILL - Boise,
ID, Volume 1 of 2, Biological Resources Technical Report
Evaluation
of Socorro Ponds Storage and Development of Environmental Enhancement
Options--Rio Bosque Wetlands Park; Task Order No. 5, Part 1 (Draft),
Boyle Engineering Corp. - Albuquerque, NM; Parsons Engineering Science,
Inc. - South Jordan, UT, DRAFT
Human
and Socioeconomic Resources Technical Report, CH2MHILL - Boise,
ID; 170 pgs., Human and Socioeconomic Resources Technical Report
2000 V. Gibbs, M.A. Stowe, D. Duke, R. Giese, M.C. Slaughter, El
Paso-Las Cruces Regional Sustainable Water Project:
Cultural
Resources Technical Report, Geo-Marine, Incorporated - El
Paso, TX; 143 pgs., Cultural Resources Technical Report
2000 El Paso-Las Cruces Regional Sustainable Water Project:
El
Paso Aqueduct Conceptual Design; Task Order No. 1, Amendment No. 4,
Part 6, Revision 1 (Final Report), Boyle; Parsons, Final,
Evaluate alignment & cost of EP Aqueduct System to initially convey
60 MGD; later convey 40 MGD of treated, potable water from the proposed
El Paso UVWTP site in Anthony, TX through Anthony Gap to northeast
El Paso.
Development
of Conceptual Salinity Management Alternatives; Task Order No. 4,
Part 1 (Final), Boyle Engineering Corp. - Albuquerque, NM;
Parsons Engineering Science, Inc. - South Jordan, UT., FINAL, Obj:1)
Complete literature review of potential sources of high levels of
salts in Rio Grande water in reach of river from Mesilla Dam to El
Paso Narrows; 2) Prepare salt mass balance of these sources; 3) Develop
conceptual salinity reduction alternatives.
Anthony/Canutillo
Membrane Treatment Pilot Plant; Task Order No. 1, Amendment No. 7,
Part 9 (Final Report), Boyle; Parsons, Final, Engineering
data to support design of an 80 MGD membrane filtration plant to be
constructed near the pilot site to treat Rio Grande water; opportunity
for equipment vendors to evaluate the performance of their membranes
while treating Rio Grande water.
El
Paso Upper Valley Water Treatment Plant Conceptual Site Layout; Task
Order No. 1, Amendment No. 9, Part 11 (Final Report), Boyle;
Parsons, Final, Develop a conceptual site layout and the Engineer's
Opinion of Probable Construction Cost for EPWU's 80 MGD UVWTP. Evaluation
of 2 water treatment options: conventional filtration water treatment
plant; membrane filtration water treatment plant.
Siting Study for Phase I Facilities for DAC; Task Order No. 1, Amendment
11, Part 13 w/Addenda; Surface Water Treatment Plant Siting Study
for the Central Planning Area of DAC - Task Order No. 1, Amendment
11, Part 13, Rev 1, Boyle Engineering Corp - Albuquerque,
NM; Parsons Engineering Science, Inc. - South Jordan , UT., Final,
Evaluation of land area requirements, construction costs & O&M costs
associated w/conventional treatment & membrane treatment processes.
The results of the study indicated that the most cost-effective treatment
process is membrane treatment.
Study
of Conveyance Facilities for Yearround Delivery of Surface Water to
Water Treatment Plants; Task Order No. 4, Part 2, Boyle Engineering
Corp - Albuquerque, NM; Parsons Engineering Science, Inc. - South
Jordan , UT., Evaluate methods of delivering water from Mesilla Dam
to the Anthony/Canutillo & Anthony Area water treatment plants; effects
of required canal modifications and water delivery requirements to
current canal operations; quantify effects of canal lining.
Hydrologic
Modeling Final Report; Task Order No. 1, Part 2 & 3; Task Order No.
1, Part 5, Subtasks 1,2,6, & 7; Task Order No. 1, Amendment No. 10,
Part 12, Including Revisions 1,3,4 and 5, Boyle Engineering
Corp - Albuquerque, NM; Parsons Engineering Science, Inc. - South
Jordan , UT., Final, Presents: data & assumptions used to develop
the linked BESTSM/MODFLOW Model; results of model's calibration and
sensitivity analyses; summary of analysis of Project Alternatives.
Detailed results of analysis of alternatives & their respective impacts.
Draft
Environmental Impact Statement, US Section, IBWC US and Mexico,
El Paso Water Utilities/Public Service Board, CH2M Hill, El Paso,
Texas, 2000, Volume I of II: Table of Contents, Executive Summary,
Chapters 1, 2, & 3--Sections 3.1 through 3.3, 494 pgs.
Draft
Environmental Impact Statement U.S. Section, IBWC, U.S. and
Mexico, & El Paso Water Utilities/Public Service Board; Volume II
of II: Chapter 3 - Sections 3.4 through 3.19, Chapters 4 through 9,
and Appendices, 378 pgs.
Final
Environmental Impact Statement U.S. Section, IBWC, U.S. and
Mexico, & El Paso Water Utilities/Public Service Board;
2001
2001 El Paso-Las Cruces Regional Sustainable Water Project:
Record of Decision, U.S. Section, International Boundary and Water
Commission, U.S./Mexico/ELP Water Utilities/PSB, This ROD documents
the selection of the Preferred Alternative-River with Local Plants
as presented in the ELP-LC Regional Sustainable Water Project. FEIS.
|
|